BayCoast Bank - Seekonk

BayCoast Bank -  Seekonk, MA

  • Land Surveying
  • Existing Conditions Survey Plan
  • Permitting
  • Perc Testing
  • Septic System Design
  • Construction Stakeout
  • Land Survey Stakeout

MBL performed land surveying to prepare an existing conditions survey plan of the site and property lines.   We also prepared detailed site plans for the new bank location with ITM/ATM drive thru lanes along with soil testing and the development of a septic system design. Permitting required and handled by MBL:  Zoning Board of Appeals, Planning Board, Conservation Commission and MASSDOT Curb Cut Permits. MBL also performed construction survey stakeout during the construction phase of the project.